UNKNOWN113929

Substation-Adjacent

Clermont County, Ohio · PJM

DC Readiness
62.2
Good / 100

UNKNOWN113929 is a substation-adjacent datacenter candidate site in Clermont County, Ohio, interconnecting through PJM. It screens at 62.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN113929
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEncore Technologies NOR1
IXP distance9.0 mi
Fiber providers5
Fiber coverage88.6%

Site characteristics

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterEncore Technologies NOR1
DC distance9.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.31¢/kWh
Industrial electricity5.67¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$7,599

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
45
Fiber connectivity12%
84
Energy cost10%
50
Water risk8%
90
Natural hazard8%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Clermont County, ranked by DC Readiness.

Sites near UNKNOWN113929
SiteTypeVoltageCapacityQueue waitScore
EC Coal Clermont CountyGreenfield3.2 yrs65.8
EC Near Walter C BeckjordGreenfield3.2 yrs65.6
EC Near Walter C BeckjordGreenfield3.2 yrs64.3
EC Coal Clermont CountyGreenfield3.2 yrs63.4
EC Coal Clermont CountyGreenfield3.2 yrs63.1
UNKNOWN113765Substation-Adjacent138 kV100 MW3.8 yrs62.3
EC Near Walter C BeckjordGreenfield3.2 yrs62.1
UNKNOWN113928Substation-Adjacent138 kV100 MW3.8 yrs62.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN113929, Clermont County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.