NORTH PROCTORVILLE SUBSTATION

Substation-Adjacent

Cabell County, Ohio · PJM

DC Readiness
63.0
Good / 100

NORTH PROCTORVILLE SUBSTATION is a substation-adjacent datacenter candidate site in Cabell County, Ohio, interconnecting through PJM. It screens at 63.0/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationNORTH PROCTORVILLE SUBSTATION
Substation distance0.0 mi
Substation voltage765 kV
Available capacity1,000 MW
UtilityOHIO POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWData Center Tariff (≥25 MW) · 85% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSecureNet DC1
IXP distance38.7 mi
Fiber providers4
Fiber coverage57.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterSecureNet DC1
DC distance38.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity12.35¢/kWh
Industrial electricity8.76¢/kWh
Cooling degree days800
Heating degree days5,000
Land price / acre$5,367

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track NORTH PROCTORVILLE SUBSTATION

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power20%
37
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
92
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Cabell County, ranked by DC Readiness.

Sites near NORTH PROCTORVILLE SUBSTATION
SiteTypeVoltageCapacityQueue waitScore
CULLODENSubstation-Adjacent765 kV1,000 MW3.8 yrs67.7
OZ CabellGreenfield——3.0 yrs60.3
EC Coal Cabell CountyGreenfield——3.0 yrs58.1
EC FFE Cabell CountyGreenfield——3.0 yrs57.8
EAST HUNTINGTONSubstation-Adjacent138 kV100 MW3.8 yrs57.7
TAP162254Substation-Adjacent138 kV100 MW3.8 yrs57.7
UNKNOWN124105Substation-Adjacent138 kV100 MW3.8 yrs57.5
MILTONSubstation-Adjacent69 kV50 MW3.8 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTH PROCTORVILLE SUBSTATION, Cabell County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.