Brooke County, Ohio · PJM

DC Readiness
60.9
Good / 100

TIDD is a substation-adjacent datacenter candidate site in Brooke County, Ohio, interconnecting through PJM. It screens at 60.9/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTIDD
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
UtilityOHIO POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWData Center Tariff (≥25 MW) · 85% min take · 12 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPDataBank Pittsburgh (PIT2)
IXP distance27.8 mi
Fiber providers3
Fiber coverage30.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDataBank Pittsburgh PIT2
DC distance27.8 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity11.25¢/kWh
Industrial electricity7.58¢/kWh
Cooling degree days800
Heating degree days5,000
Land price / acre$4,024

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TIDD

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power20%
37
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
92
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Brooke County, ranked by DC Readiness.

Sites near TIDD
SiteTypeVoltageCapacityQueue waitScore
EC Coal Brooke CountyGreenfield——3.0 yrs62.5
EC Coal Brooke CountyGreenfield——3.0 yrs62.1
EC Coal Brooke CountyGreenfield——3.0 yrs60.6
EC Coal Brooke CountyGreenfield——3.0 yrs60.4
EC Coal Brooke CountyGreenfield——3.0 yrs59.1
MAHANS LANESubstation-Adjacent138 kV100 MW3.8 yrs58.4
EC Coal Brooke CountyGreenfield——3.0 yrs58.3
UNKNOWN108779Substation-Adjacent138 kV100 MW3.8 yrs58.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.