Former Minster Oil Facility

Industrial

Auglaize County, Ohio · PJM

DC Readiness
48.7
Fair / 100

Former Minster Oil Facility is an industrial datacenter candidate site in Auglaize County, Ohio, interconnecting through PJM. It screens at 48.7/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityDAYTON POWER & LIGHT COinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPMicrotronix Datacenter Ottoville
IXP distance37.2 mi
Fiber providers8
Fiber coverage53.1%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterMicrotronix Datacenter Ottoville
DC distance37.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.17¢/kWh
Industrial electricity8.31¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$10,250

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Former Minster Oil Facility

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
90
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Auglaize County, ranked by DC Readiness.

Sites near Former Minster Oil Facility
SiteTypeVoltageCapacityQueue waitScore
EC Near St MarysGreenfield——3.2 yrs59.1
EC Near St MarysGreenfield——3.2 yrs57.9
EC Near St MarysGreenfield——3.2 yrs56.6
EC Near St MarysGreenfield——3.2 yrs56.6
TAP141223Substation-Adjacent138 kV100 MW3.8 yrs56.3
EC Near St MarysGreenfield——3.2 yrs55.7
EC Near St MarysGreenfield——3.2 yrs55.5
EC Near St MarysGreenfield——3.2 yrs53.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Former Minster Oil Facility, Auglaize County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.