Substation-Adjacent site at 48.660, -99.451

Substation-Adjacent

Towner County, North Dakota · MISO

DC Readiness
57.5
Good / 100

At a glance

Substation-Adjacent site at 48.660, -99.451 is a substation-adjacent datacenter candidate site in Towner County, North Dakota, scoring 57.5/100 DC Readiness — 1st of 4 scored sites in the county. Its nearest substation is UNKNOWN134109 (0 mi, 115 kV). It sits in the MISO grid region and the NORTHERN PLAINS ELECTRIC COOP service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN134109
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityNORTHERN PLAINS ELECTRIC COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth20
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPMidco Grand Forks
IXP distance120.5 mi
Fiber providers3
Fiber coverage100.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score80/100

Location context

Nearest datacenterMidco Grand Forks
DC distance120.5 mi
County hazard (FEMA NRI)Relatively Low (20)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity9.04¢/kWh
Industrial electricity7.92¢/kWh
Cooling degree days500
Heating degree days8,600
Land price / acre$1,929

Regulatory climate

Favorablestate posture · as of 2026-08

Cheap power, land, and cold climate; DC-friendly.

DC tax incentiveYes

Incentive detail: Property tax exemption for new DC construction for up to 5 years.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 3 nearby

Get alerts

Track UNKNOWN134109

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 48.660, -99.451 compare with other sites in Towner County?

Substation-Adjacent site at 48.660, -99.451 ranks 1st of 4 scored candidate sites in Towner County. Its 57.5/100 is roughly in line with the county average of 54.3. It is roughly in line with the North Dakota average of 55.7 and roughly in line with the national average of 53.2.

Against the North Dakota average, its strongest sub-score is power availability (56 vs 43) and its weakest is speed to power (49 vs 51). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 48.660, -99.451 to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN134109, is about 0 miles away and operates at 115 kV. The nearest located transmission bottleneck is TMP293_RUGBY230_RUGBY_115kV_flto_RUGBY230_BALTAJ (MISO), 33 miles away. For connectivity, the nearest internet exchange facility is Midco Grand Forks at 120.5 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Midco Grand Forks, 120.5 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 48.660, -99.451?

At the county level, FEMA's National Risk Index rates Towner County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
49
Fiber connectivity12%
74
Energy cost10%
50
Water risk7%
80
Natural hazard6%
80
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Towner County, ranked by DC Readiness.

Sites near Substation-Adjacent site at 48.660, -99.451
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN134112Substation-Adjacent115 kV100 MW4.3 yrs57.2
Former Integra Castings FacilityIndustrial——4.3 yrs51.7
Greenfield (UNKNOWN134109 - LEEDS)Greenfield115 kV100 MW4.3 yrs50.8

Substation-Adjacent site at 48.660, -99.451: common questions

What is the DC Readiness score of Substation-Adjacent site at 48.660, -99.451?

Substation-Adjacent site at 48.660, -99.451 scores 57.5/100 on the GridCensus DC Readiness scale, rated good. It ranks 1st of 4 scored sites in Towner County. The Towner County average is 54.3 and the North Dakota average is 55.7.

What is the nearest substation to Substation-Adjacent site at 48.660, -99.451?

The nearest mapped substation is UNKNOWN134109, about 0 miles away, at 115 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 48.660, -99.451?

NORTHERN PLAINS ELECTRIC COOP (cooperative) holds the retail service territory that contains the site.

What grid region is Substation-Adjacent site at 48.660, -99.451 in?

Substation-Adjacent site at 48.660, -99.451 is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Substation-Adjacent site at 48.660, -99.451 from an internet exchange?

The nearest internet exchange facility is Midco Grand Forks, about 120.5 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 48.660, -99.451, Towner County, ND”, https://gridcensus.com/datacenter-sites/north-dakota/towner-county/unknown134109-e66853b1 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 48.660, -99.451, Towner County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.