Clay County, North Dakota · MISO

DC Readiness
57.9
Good / 100

TAP135335 is a substation-adjacent datacenter candidate site in Clay County, North Dakota, interconnecting through MISO. It screens at 57.9/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP135335
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityCASS COUNTY ELEC COOP INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth20
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDCN Dakota Carrier Networks
IXP distance12.7 mi
Fiber providers13
Fiber coverage28.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDakota Carrier Network
DC distance12.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.71¢/kWh
Industrial electricity9.84¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$4,738

Regulatory climate

Favorablestate posture · as of 2026-08

Cheap power, land, and cold climate; DC-friendly.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP135335

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
49
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Clay County, ranked by DC Readiness.

Sites near TAP135335
SiteTypeVoltageCapacityQueue waitScore
SHEYENNESubstation-Adjacent230 kV300 MW4.3 yrs66.4
FRONTIERSubstation-Adjacent230 kV300 MW4.3 yrs65.4
MOORHEADSubstation-Adjacent230 kV300 MW4.3 yrs65.1
UNKNOWN130186Substation-Adjacent115 kV100 MW4.3 yrs63.3
UNKNOWN130184Substation-Adjacent115 kV100 MW4.3 yrs63.2
UNKNOWN130187Substation-Adjacent115 kV100 MW4.3 yrs63.2
UNKNOWN130183Substation-Adjacent115 kV100 MW4.3 yrs63.1
EC Near MoorheadGreenfield——4.3 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for TAP135335, Clay County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.