UNKNOWN114681

Substation-Adjacent

Rowan County, North Carolina · PJM

DC Readiness
55.5
Good / 100

UNKNOWN114681 is a substation-adjacent datacenter candidate site in Rowan County, North Carolina, interconnecting through PJM. It screens at 55.5/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN114681
Substation distance0.0 mi
Substation voltage100 kV
Available capacity50 MW
UtilityDUKE ENERGY CAROLINAS, LLCinvestor ownedmoderate to large load · terms ≥ 100 MWLarge Load Customer terms (≥100 MW): minimum bills, contract demand · 10 yr

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth177
Avg queue wait3.8 yrs

Connectivity

Nearest IXPSegra Kannapolis
IXP distance12.4 mi
Fiber providers9
Fiber coverage52.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterSegra Kannapolis
DC distance12.4 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.94¢/kWh
Industrial electricity7.05¢/kWh
Cooling degree days1,600
Heating degree days3,300
Land price / acre$6,780

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment and electricity for $75M+ investments; property tax abatement.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN114681

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
49
Speed to power20%
40
Fiber connectivity12%
79
Energy cost10%
50
Water risk7%
84
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Rowan County, ranked by DC Readiness.

Sites near UNKNOWN114681
SiteTypeVoltageCapacityQueue waitScore
WOODLEAF SWITCHING STATIONSubstation-Adjacent500 kV1,000 MW3.8 yrs65.6
UNKNOWN114701Substation-Adjacent230 kV300 MW3.8 yrs64.6
OZ RowanGreenfield——4.3 yrs60.5
EC Near BuckGreenfield——4.3 yrs59.0
OZ RowanGreenfield——4.3 yrs58.0
EC Near BuckGreenfield——4.3 yrs57.9
EC Near BuckGreenfield——4.3 yrs57.7
EC Coal Rowan CountyGreenfield——4.3 yrs57.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN114681, Rowan County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.