OZ Union
GreenfieldUnion, New Jersey · PJM
OZ Union is a greenfield datacenter candidate site in Union, New Jersey, interconnecting through PJM. It screens at 61.9/100 DC Readiness and a 2.6 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Union, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| PSEG Linden Generating Station | Brownfield | — | 381 MW | — | 74.6 |
| UNKNOWN133141 | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 71.2 |
| LAFAYETTE ROAD STATION | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 70.8 |
| BAYWAY | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 70.8 |
| FANWOOD | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 70.7 |
| ALDENE | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 69.9 |
| SUMMIT | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 69.9 |
| NEW DOVER | Substation-Adjacent | 230 kV | 300 MW | 3.5 yrs | 69.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for OZ Union, Union. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.