BAYWAY
Substation-AdjacentUnion, New Jersey · PJM
BAYWAY is a substation-adjacent datacenter candidate site in Union, New Jersey, interconnecting through PJM. It screens at 67.4/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Union, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Jersey Gardens Mall Solar #1 | Brownfield | — | 2 MW | 3.8 yrs | 67.0 |
| Linden Solar Farm | Brownfield | — | 3 MW | 3.8 yrs | 65.7 |
| LAFAYETTE ROAD STATION | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.7 |
| UNKNOWN133139 | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.6 |
| Drew University (GSHP) | Brownfield | — | — | 3.8 yrs | 65.4 |
| UNKNOWN133141 | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.4 |
| WOODBRIDGE | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.3 |
| ALDENE | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 64.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for BAYWAY, Union. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.