UNKNOWN133141 is a substation-adjacent datacenter candidate site in Union, New Jersey, interconnecting through PJM. It screens at 65.4/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN133141
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionPJM
Queue depth222
Avg queue wait3.8 yrs

Connectivity

Nearest IXPMetanet New York Data Center Staten Island
IXP distance3.8 mi
Fiber providers7
Fiber coverage99.7%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterBarclays Datacenter
DC distance2.7 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.78¢/kWh
Industrial electricity7.18¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$105,823

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
32
Fiber connectivity12%
93
Energy cost10%
50
Water risk8%
84
Natural hazard8%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Union, ranked by DC Readiness.

Sites near UNKNOWN133141
SiteTypeVoltageCapacityQueue waitScore
BAYWAYSubstation-Adjacent345 kV600 MW3.8 yrs67.4
Jersey Gardens Mall Solar #1Brownfield2 MW3.8 yrs67.0
Linden Solar FarmBrownfield3 MW3.8 yrs65.7
LAFAYETTE ROAD STATIONSubstation-Adjacent230 kV300 MW3.8 yrs65.7
UNKNOWN133139Substation-Adjacent230 kV300 MW3.8 yrs65.6
Drew University (GSHP)Brownfield3.8 yrs65.4
WOODBRIDGESubstation-Adjacent230 kV300 MW3.8 yrs65.3
ALDENESubstation-Adjacent230 kV300 MW3.8 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN133141, Union. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.