Municipal Repair Facility

Industrial

Morris County, New Jersey · PJM

DC Readiness
45.2
Fair / 100

Municipal Repair Facility is a industrial datacenter candidate site in Morris County, New Jersey, interconnecting through PJM. It screens at 45.2/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth266

Connectivity

Nearest IXPCologix NNJ2
IXP distance10.4 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterCologix NNJ2
DC distance10.4 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.56¢/kWh
Industrial electricity8.27¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$30,022

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
70
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Morris County, ranked by DC Readiness.

Sites near Municipal Repair Facility
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132392Substation-Adjacent230 kV300 MW3.0 yrs75.2
UNKNOWN132944Substation-Adjacent230 kV300 MW3.5 yrs70.3
Greenfield (UNKNOWN132619 - BRANCHBURG)Greenfield500 kV1,000 MW3.0 yrs69.5
UNKNOWN132619Substation-Adjacent500 kV1,000 MW3.5 yrs69.5
Greenfield (UNKNOWN132619 - BRANCHBURG)Greenfield500 kV1,000 MW3.0 yrs68.8
UNKNOWN132302Substation-Adjacent230 kV300 MW3.0 yrs68.3
UNKNOWN132303Substation-Adjacent230 kV300 MW3.5 yrs67.8
Greenfield (PORTLAND STATION - UNKNOWN1636)Greenfield230 kV300 MW3.0 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Municipal Repair Facility, Morris County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.