Study Area within Struthers-Dunn Site

Industrial

Gloucester County, New Jersey · PJM

DC Readiness
52.8
Fair / 100

Study Area within Struthers-Dunn Site is an industrial datacenter candidate site in Gloucester County, New Jersey, interconnecting through PJM. It screens at 52.8/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth222
Avg queue wait3.8 yrs

Connectivity

Nearest IXPTierPoint Philadelphia
IXP distance10.6 mi
Fiber providers5
Fiber coverage52.0%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterDatacenter 607483487
DC distance6.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.97¢/kWh
Industrial electricity8.49¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$14,091

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
32
Fiber connectivity12%
81
Energy cost10%
50
Water risk8%
84
Natural hazard8%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Gloucester County, ranked by DC Readiness.

Sites near Study Area within Struthers-Dunn Site
SiteTypeVoltageCapacityQueue waitScore
Woodbury High School & Annex (GSHP)Brownfield230 kV3.8 yrs66.2
Paulsboro Terminal LandfillBrownfield230 kV0 MW3.8 yrs65.7
DEPTFORDSubstation-Adjacent230 kV300 MW3.8 yrs63.8
MICKLETONSubstation-Adjacent230 kV300 MW3.8 yrs63.6
THOROFARESubstation-Adjacent230 kV300 MW3.8 yrs63.5
UNKNOWN141124Substation-Adjacent230 kV300 MW3.8 yrs63.4
EC Coal Gloucester CountyGreenfield2.6 yrs62.6
EC Near Mickleton StationGreenfield2.6 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.