Block 128, Lot 2
IndustrialBergen County, New Jersey · PJM
Block 128, Lot 2 is an industrial datacenter candidate site in Bergen County, New Jersey, interconnecting through PJM. It screens at 55.7/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Bergen County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Hackensack Solar Farm | Brownfield | 230 kV | 1 MW | 3.8 yrs | 66.8 |
| MAYWOOD | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.9 |
| Diamond Chemical Co. Solar | Brownfield | — | 1 MW | 3.8 yrs | 65.8 |
| WALDWICK | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 65.7 |
| SADDLE BROOK | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 65.6 |
| EC Near Bergen Generating Station | Greenfield | — | — | 2.6 yrs | 65.6 |
| Carlstadt Scientific Chemical Processing , Inc. | Brownfield | — | 2 MW | 3.8 yrs | 64.8 |
| NEW MILFORD | Substation-Adjacent | 230 kV | 300 MW | 3.8 yrs | 64.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.