Falsano Development

Industrial

Atlantic County, New Jersey · PJM

DC Readiness
41.6
Fair / 100

Falsano Development is a industrial datacenter candidate site in Atlantic County, New Jersey, interconnecting through PJM. It screens at 41.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth266

Connectivity

Nearest IXPTierPoint Philadelphia
IXP distance53.9 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDatacenter 607483487
DC distance52.4 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.79¢/kWh
Industrial electricity9.19¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$14,983

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
34
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Atlantic County, ranked by DC Readiness.

Sites near Falsano Development
SiteTypeVoltageCapacityQueue waitScore
LEWISSubstation-Adjacent138 kV100 MW2.6 yrs61.2
SCULLSubstation-Adjacent138 kV100 MW2.6 yrs58.1
EC Near Missouri AvenueGreenfield2.6 yrs57.7
Greenfield (NEW FREEDOM - CARDIFF)Greenfield230 kV300 MW3.0 yrs57.3
Greenfield (NEW FREEDOM - CARDIFF)Greenfield230 kV300 MW3.0 yrs56.9
OZ AtlanticGreenfield2.6 yrs56.6
Coastal Solar CarportBrownfield0 MW56.4
Greenfield (CEDAR STATION - CARDIFF)Greenfield230 kV300 MW2.6 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Falsano Development, Atlantic County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.