Skip to content
Gridcensus

Webster County, Missouri · MISO

DC Readiness
54.5
Fair / 100

TAP173550 is a substation-adjacent datacenter candidate site in Webster County, Missouri, interconnecting through MISO. It screens at 54.5/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP173550
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityWEBSTER ELECTRIC COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait2.8 yrs

Connectivity

Nearest IXPBluebird Underground Data Center
IXP distance18.0 mi
Fiber providers5
Fiber coverage30.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterBluebird Underground Data Center
DC distance18.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.48¢/kWh
Industrial electricity9.91¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,559

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP173550

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Webster County, ranked by DC Readiness.

Sites near TAP173550
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN122396Substation-Adjacent161 kV100 MW2.8 yrs59.1
UNKNOWN168466Substation-Adjacent161 kV100 MW2.8 yrs58.7
UNKNOWN168465Substation-Adjacent161 kV100 MW2.8 yrs58.4
UNKNOWN117551Substation-Adjacent161 kV100 MW2.8 yrs57.4
UNKNOWN153829Substation-Adjacent69 kV50 MW2.8 yrs54.9
UNKNOWN117639Substation-Adjacent69 kV50 MW2.8 yrs53.9
Greenfield (UNKNOWN122396 - UNKNOWN168465)Greenfield161 kV100 MW2.8 yrs52.8
Mine SiteFormer Mine——2.8 yrs50.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP173550, Webster County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.