Mine Site

Former Mine

Taney County, Missouri · MISO

DC Readiness
42.6
Fair / 100

Mine Site is a former mine datacenter candidate site in Taney County, Missouri, interconnecting through MISO. It screens at 42.6/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth34

Connectivity

Nearest IXPBluebird Underground Data Center
IXP distance39.6 mi

Site characteristics

Site typeFormer Mine
Former useMining: Stone; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterBluebird Underground Data Center
DC distance39.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.50¢/kWh
Industrial electricity9.52¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$3,385

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Taney County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
TAP154702Substation-Adjacent161 kV100 MW1.4 yrs63.2
UNKNOWN117623Substation-Adjacent161 kV100 MW1.4 yrs63.1
UNKNOWN122700Substation-Adjacent161 kV100 MW1.4 yrs61.7
OZARK BEACHSubstation-Adjacent161 kV100 MW1.4 yrs60.9
UNKNOWN117437Substation-Adjacent161 kV100 MW1.4 yrs60.4
UNKNOWN122701Substation-Adjacent161 kV100 MW1.4 yrs60.2
Greenfield (UNKNOWN121678 - TABLE ROCK DAM)Greenfield161 kV100 MW3.4 yrs60.1
Greenfield (OZARK BEACH - TAP154695)Greenfield161 kV100 MW1.4 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Taney County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.