Skip to content
Gridcensus

Mine Site

Former Mine

Shelby County, Missouri · MISO

DC Readiness
51.2
Fair / 100

Mine Site is a former mine datacenter candidate site in Shelby County, Missouri, interconnecting through MISO. It screens at 51.2/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth39
Avg queue wait2.8 yrs

Connectivity

Nearest IXPTierPoint St. Louis – Millpark
IXP distance116.4 mi
Fiber providers4
Fiber coverage77.1%

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterAT&T DC
DC distance41.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.10¢/kWh
Industrial electricity7.68¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$6,127

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
46
Fiber connectivity12%
68
Energy cost10%
50
Water risk8%
88
Natural hazard8%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Shelby County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120872Substation-Adjacent69 kV50 MW2.8 yrs51.7
UNKNOWN120871Substation-Adjacent69 kV50 MW2.8 yrs51.7
UNKNOWN117820Substation-Adjacent69 kV50 MW2.8 yrs51.7
TAP140526Substation-Adjacent69 kV50 MW2.8 yrs51.7
TAP140527Substation-Adjacent69 kV50 MW2.8 yrs51.7
Mine SiteFormer Mine2.8 yrs51.6
Snider Implement Company, Shelby County Food PantryIndustrial2.8 yrs51.6
FALCO-Clarence, Fairfield Aluminum Casting CompanyIndustrial2.8 yrs51.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Shelby County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.