Skip to content
Gridcensus

Mine Site

Former Mine

New Madrid County, Missouri · SERC

DC Readiness
54.1
Fair / 100

Mine Site is a former mine datacenter candidate site in New Madrid County, Missouri, interconnecting through SERC. It screens at 54.1/100 DC Readiness and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPQuad State Internet METRO1 Colocation
IXP distance57.6 mi
Fiber providers4
Fiber coverage40.1%

Site characteristics

Site typeFormer Mine
Former useMining: Coal; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterRiot Kentucky
DC distance57.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.29¢/kWh
Industrial electricity7.59¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$6,704

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
73
Fiber connectivity12%
58
Energy cost10%
50
Water risk8%
88
Natural hazard8%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in New Madrid County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
NEW MADRIDSubstation-Adjacent500 kV1,000 MW2.8 yrs60.7
WEST NEW MADRIDSubstation-Adjacent500 kV1,000 MW2.8 yrs59.9
OZ New MadridGreenfield1.4 yrs58.5
OZ New MadridGreenfield1.4 yrs57.8
OZ New MadridGreenfield1.4 yrs57.2
OZ New MadridGreenfield1.4 yrs56.8
UNKNOWN117855Substation-Adjacent161 kV100 MW2.8 yrs52.7
UNKNOWN122582Substation-Adjacent161 kV100 MW2.8 yrs51.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, New Madrid County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.