Logsdon Property
IndustrialLewis County, Missouri · MISO
Logsdon Property is an industrial datacenter candidate site in Lewis County, Missouri, interconnecting through MISO. It screens at 50.7/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Lewis County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP140599 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 51.3 |
| TAP140600 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 51.3 |
| UNKNOWN118642 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 51.3 |
| UNKNOWN118644 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 51.3 |
| TAP140596 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 51.3 |
| LaGrange Foundry | Industrial | — | — | 2.8 yrs | 51.2 |
| River Port | Industrial | — | — | 2.8 yrs | 50.8 |
| Lewis County Intermodal Transportation and Storage, Canton Redevelopment Project | Industrial | — | — | 2.8 yrs | 50.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Logsdon Property, Lewis County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.