Bailey Property, Canton Redevelopment Project

Industrial

Lewis County, Missouri · MISO

DC Readiness
48.0
Fair / 100

Bailey Property, Canton Redevelopment Project is an industrial datacenter candidate site in Lewis County, Missouri, interconnecting through MISO. It screens at 48.0/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityUNION ELECTRIC CO - (MO)investor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait2.8 yrs

Connectivity

Nearest IXPSFN IA-Davenport
IXP distance108.5 mi
Fiber providers5
Fiber coverage65.3%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterAT&T DC
DC distance56.5 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.33¢/kWh
Industrial electricity7.36¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,861

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Bailey Property, Canton Redevelopment Project

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
28
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Lewis County, ranked by DC Readiness.

Sites near Bailey Property, Canton Redevelopment Project
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118644Substation-Adjacent69 kV50 MW2.8 yrs52.5
TAP140600Substation-Adjacent69 kV50 MW2.8 yrs52.0
TAP140599Substation-Adjacent69 kV50 MW2.8 yrs51.8
TAP140596Substation-Adjacent69 kV50 MW2.8 yrs51.4
UNKNOWN118642Substation-Adjacent69 kV50 MW2.8 yrs51.2
LaGrange FoundryIndustrial——2.8 yrs48.5
River PortIndustrial——2.8 yrs48.1
Lewis County Intermodal Transportation and Storage, Canton Redevelopment ProjectIndustrial——2.8 yrs48.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Bailey Property, Canton Redevelopment Project, Lewis County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.