UNKNOWN121097
Substation-AdjacentCole County, Missouri · MISO
UNKNOWN121097 is a substation-adjacent datacenter candidate site in Cole County, Missouri, interconnecting through MISO. It screens at 51.4/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Cole County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Cole | Greenfield | — | — | 1.4 yrs | 62.8 |
| OZ Cole | Greenfield | — | — | 1.4 yrs | 62.3 |
| EC Coal Cole County | Greenfield | — | — | 1.4 yrs | 61.4 |
| UNKNOWN117963 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.3 |
| UNKNOWN121305 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.3 |
| UNKNOWN117196 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.3 |
| UNKNOWN117083 | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 54.2 |
| UNKNOWN117896 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 52.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN121097, Cole County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.