UNKNOWN117141

Substation-Adjacent

Cedar County, Missouri · MISO

DC Readiness
55.5
Good / 100

UNKNOWN117141 is a substation-adjacent datacenter candidate site in Cedar County, Missouri, interconnecting through MISO. It screens at 55.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN117141
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilitySAC-OSAGE ELECTRIC COOP INCnot available

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait2.8 yrs

Connectivity

Nearest IXPBluebird Underground Data Center
IXP distance44.3 mi
Fiber providers3
Fiber coverage92.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterBluebird Underground Data Center
DC distance44.3 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.84¢/kWh
Industrial electricity7.56¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$3,763

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 5 nearby

Get alerts

Track UNKNOWN117141

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
45
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Cedar County, ranked by DC Readiness.

Sites near UNKNOWN117141
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121651Substation-Adjacent161 kV100 MW2.8 yrs56.0
UNKNOWN121634Substation-Adjacent161 kV100 MW2.8 yrs55.4
TAP153676Substation-Adjacent161 kV100 MW2.8 yrs55.4
UNKNOWN121633Substation-Adjacent161 kV100 MW2.8 yrs55.4
Mine SiteFormer Mine——2.8 yrs49.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN117141, Cedar County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.