Britton Certified Site

Industrial

Cass County, Missouri · MISO

DC Readiness
54.4
Fair / 100

Britton Certified Site is an industrial datacenter candidate site in Cass County, Missouri, interconnecting through MISO. It screens at 54.4/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth39
Avg queue wait2.8 yrs

Connectivity

Nearest IXPQTS Overland Park (OVP1)
IXP distance14.7 mi
Fiber providers12
Fiber coverage74.5%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterQTS Overland Park (OVP1)
DC distance14.7 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.56¢/kWh
Industrial electricity7.04¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,459

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
46
Fiber connectivity12%
81
Energy cost10%
50
Water risk8%
88
Natural hazard8%
62
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Cass County, ranked by DC Readiness.

Sites near Britton Certified Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN117601Substation-Adjacent345 kV600 MW2.8 yrs65.2
DOGWOODSubstation-Adjacent345 kV600 MW2.8 yrs63.5
EC Coal Cass CountyGreenfield1.4 yrs61.7
UNKNOWN121757Substation-Adjacent161 kV100 MW2.8 yrs60.7
UNKNOWN117399Substation-Adjacent161 kV100 MW2.8 yrs60.4
UNKNOWN121759Substation-Adjacent161 kV100 MW2.8 yrs58.5
UNKNOWN117600Substation-Adjacent161 kV100 MW2.8 yrs58.0
UNKNOWN117075Substation-Adjacent161 kV100 MW2.8 yrs58.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Britton Certified Site, Cass County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.