UNKNOWN120023

Substation-Adjacent

Caldwell County, Missouri · MISO

DC Readiness
55.3
Good / 100

UNKNOWN120023 is a substation-adjacent datacenter candidate site in Caldwell County, Missouri, interconnecting through MISO. It screens at 55.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN120023
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityFARMERS ELECTRIC COOP, INC - (MO)cooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth52
Avg queue wait2.8 yrs

Connectivity

Nearest IXPLightEdge Kansas City Subtropolis (KCI1)
IXP distance54.1 mi
Fiber providers6
Fiber coverage62.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score62/100

Location context

Nearest datacenterCenturyLink
DC distance8.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.23¢/kWh
Industrial electricity7.98¢/kWh
Cooling degree days1,500
Heating degree days4,700
Land price / acre$4,467

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Qualified data center sales tax exemption (2019 law); state income tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track UNKNOWN120023

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
88
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
50

Nearby comparable sites

Other scored datacenter candidate sites in Caldwell County, ranked by DC Readiness.

Sites near UNKNOWN120023
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120025Substation-Adjacent69 kV50 MW2.8 yrs55.3
UNKNOWN120022Substation-Adjacent69 kV50 MW2.8 yrs54.4
TAP138778Substation-Adjacent69 kV50 MW2.8 yrs54.2
Mine SiteFormer Mine2.8 yrs51.0
BRAYMER, MO (VOR/DME)Federal Excess3.8 yrs49.7
BRAYMER, MO (VOR/DME)Federal Excess3.8 yrs49.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN120023, Caldwell County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.