AMCO MFG., INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING)

Manufacturing

Yazoo County, Mississippi

DC Readiness
47.2
Fair / 100

AMCO MFG., INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING) is a manufacturing datacenter candidate site in Yazoo County, Mississippi. It screens at 47.2/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPC Spire Mississippi
IXP distance104.5 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance26.1 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity15.40¢/kWh
Industrial electricity7.46¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,216

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
34
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Yazoo County, ranked by DC Readiness.

Sites near AMCO MFG., INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN157205Substation-Adjacent115 kV100 MW1.4 yrs64.4
UNKNOWN110120Substation-Adjacent115 kV100 MW1.4 yrs64.1
TAP142155Substation-Adjacent115 kV100 MW1.4 yrs63.8
YAZOOSubstation-Adjacent115 kV100 MW1.4 yrs63.8
UNKNOWN110076Substation-Adjacent115 kV100 MW1.4 yrs63.7
UNKNOWN110074Substation-Adjacent115 kV100 MW1.4 yrs63.3
UNKNOWN109970Substation-Adjacent115 kV100 MW1.4 yrs62.7
UNKNOWN110074Substation-Adjacent115 kV100 MW1.4 yrs61.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AMCO MFG., INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING), Yazoo County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.