TEMTCO STEEL CORP. (NOT AVAILABLE)

Manufacturing

Winston County, Mississippi

DC Readiness
51.7
Fair / 100

TEMTCO STEEL CORP. (NOT AVAILABLE) is a manufacturing datacenter candidate site in Winston County, Mississippi. It screens at 51.7/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityEAST MISSISSIPPI ELEC PWR ASSNcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance27.9 mi
Fiber providers3
Fiber coverage73.1%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterC Spire Mississippi
DC distance27.9 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.05¢/kWh
Industrial electricity6.08¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,658

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TEMTCO STEEL CORP. (NOT AVAILABLE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Winston County, ranked by DC Readiness.

Sites near TEMTCO STEEL CORP. (NOT AVAILABLE)
SiteTypeVoltageCapacityQueue waitScore
OZ WinstonGreenfield——1.4 yrs60.3
UNKNOWN109367Substation-Adjacent161 kV100 MW2.8 yrs57.6
UNKNOWN109366Substation-Adjacent161 kV100 MW2.8 yrs56.9
UNKNOWN169521Substation-Adjacent161 kV100 MW2.8 yrs56.4
TAP169522Substation-Adjacent161 kV100 MW2.8 yrs56.3
EC Coal Winston CountyGreenfield——1.4 yrs56.2
UNKNOWN109365Substation-Adjacent161 kV100 MW2.8 yrs55.9
TAP144743Substation-Adjacent161 kV100 MW2.8 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.