Mine Site

Former Mine

Wilkinson County, Mississippi · MISO

DC Readiness
48.6
Fair / 100

Mine Site is a former mine datacenter candidate site in Wilkinson County, Mississippi, interconnecting through MISO. It screens at 48.6/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth8
Avg queue wait2.8 yrs

Connectivity

Nearest IXPVenyu BTR1
IXP distance44.3 mi
Fiber providers2
Fiber coverage14.2%

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterVenyu BTR1
DC distance44.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.24¢/kWh
Industrial electricity9.10¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,905

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 5 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
53
Fiber connectivity12%
47
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Wilkinson County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
EC FFE Wilkinson CountyGreenfield1.4 yrs55.8
UNKNOWN110659Substation-Adjacent115 kV100 MW2.8 yrs50.4
POLYMER RESEARCH CORP. (ALL OTHER BASIC INORGANIC CHEMICAL MANUFACTURING)Manufacturing3.5 yrs48.6
UNKNOWN115945Substation-Adjacent115 kV100 MW2.8 yrs48.2
NETTERVILLE LUMBER CO., FRED (SAWMILLS)Manufacturing3.5 yrs47.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.