Skip to content
Gridcensus

SCOTCH PLYWOOD CO., INC. (HARDWOOD VENEER AND PLYWOOD MANUFACTURING)

Manufacturing

Wayne County, Mississippi

DC Readiness
50.4
Fair / 100

SCOTCH PLYWOOD CO., INC. (HARDWOOD VENEER AND PLYWOOD MANUFACTURING) is a manufacturing datacenter candidate site in Wayne County, Mississippi. It screens at 50.4/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

Avg queue wait3.5 yrs

Connectivity

Nearest IXPEdgeConneX New Orleans (EDCSLI01)
IXP distance114.9 mi
Fiber providers7
Fiber coverage86.3%

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Web Services
DC distance105.4 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.25¢/kWh
Industrial electricity9.11¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,372

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
74
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Wayne County, ranked by DC Readiness.

Sites near SCOTCH PLYWOOD CO., INC. (HARDWOOD VENEER AND PLYWOOD MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109405Substation-Adjacent230 kV300 MW2.8 yrs57.8
UNKNOWN109763Substation-Adjacent115 kV100 MW2.8 yrs53.4
UNKNOWN109766Substation-Adjacent115 kV100 MW2.8 yrs53.4
TAP169513Substation-Adjacent115 kV100 MW2.8 yrs53.4
UNKNOWN169512Substation-Adjacent115 kV100 MW2.8 yrs53.4
TAP169518Substation-Adjacent115 kV100 MW2.8 yrs53.4
UNKNOWN169516Substation-Adjacent115 kV100 MW2.8 yrs53.4
Greenfield (UNKNOWN109403 - WAYNESBORO)Greenfield230 kV300 MW2.8 yrs51.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SCOTCH PLYWOOD CO., INC. (HARDWOOD VENEER AND PLYWOOD MANUFACTURING), Wayne County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.