TYLERTOWN WEAR PARTS, INC. (SAWMILL AND WOODWORKING MACHINERY MANUFACTURING)
ManufacturingWalthall County, Mississippi
TYLERTOWN WEAR PARTS, INC. (SAWMILL AND WOODWORKING MACHINERY MANUFACTURING) is a manufacturing datacenter candidate site in Walthall County, Mississippi. It screens at 49.0/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Walthall County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC FFE Walthall County | Greenfield | — | — | 1.4 yrs | 57.7 |
| TAP143359 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| TYLERTOWN | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| UNKNOWN110827 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 54.2 |
| TAP143090 | Substation-Adjacent | 115 kV | 100 MW | 2.8 yrs | 53.4 |
| WINDMILL PALLETS, INC. (WOOD CONTAINER AND PALLET MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.6 |
| JONES CHIP MILL, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING) | Manufacturing | — | — | 3.5 yrs | 50.6 |
| DIXIE MAT & HARDWOOD CO., INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 50.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TYLERTOWN WEAR PARTS, INC. (SAWMILL AND WOODWORKING MACHINERY MANUFACTURING), Walthall County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.