INTERNATIONAL CONVERTER IUKA (OTHER ALUMINUM ROLLING AND DRAWING)

Manufacturing

Tishomingo County, Mississippi

DC Readiness
50.4
Fair / 100

INTERNATIONAL CONVERTER IUKA (OTHER ALUMINUM ROLLING AND DRAWING) is a manufacturing datacenter candidate site in Tishomingo County, Mississippi. It screens at 50.4/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityTISHOMINGO COUNTY E P Acooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPSimple Helix
IXP distance85.7 mi
Fiber providers6
Fiber coverage99.8%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterSimpleHelix
DC distance85.7 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.61¢/kWh
Industrial electricity5.67¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,290

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track INTERNATIONAL CONVERTER IUKA (OTHER ALUMINUM ROLLING AND DRAWING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Tishomingo County, ranked by DC Readiness.

Sites near INTERNATIONAL CONVERTER IUKA (OTHER ALUMINUM ROLLING AND DRAWING)
SiteTypeVoltageCapacityQueue waitScore
TAP154398Substation-Adjacent161 kV100 MW1.0 yrs60.0
TAP154380Substation-Adjacent161 kV100 MW2.8 yrs56.5
UNKNOWN111027Substation-Adjacent161 kV100 MW2.8 yrs56.5
TAP154381Substation-Adjacent161 kV100 MW2.8 yrs56.4
BURNSVILLESubstation-Adjacent161 kV100 MW2.8 yrs56.2
Greenfield (CHEROKEE - TAP154380)Greenfield161 kV100 MW1.0 yrs54.9
ALLIANT TECHSYSTEMS, INC. (AEROSPACE PRODUCT AND PARTS MANUFACTURING)Manufacturing3.5 yrs50.4
GOLDEN MFG. CO. (MEN'S AND BOYS' CUT AND SEW WORK CLOTHING MANUFACTURING)Manufacturing3.5 yrs50.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for INTERNATIONAL CONVERTER IUKA (OTHER ALUMINUM ROLLING AND DRAWING), Tishomingo County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.