CHARLESTON INDUSTRIES, INC. (SIGN MANUFACTURING)

Manufacturing

Tallahatchie County, Mississippi

DC Readiness
48.3
Fair / 100

CHARLESTON INDUSTRIES, INC. (SIGN MANUFACTURING) is a manufacturing datacenter candidate site in Tallahatchie County, Mississippi. It screens at 48.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance70.7 mi
Fiber providers4
Fiber coverage46.8%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterxAI Macrohardrr
DC distance67.9 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.07¢/kWh
Industrial electricity7.90¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,576

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track CHARLESTON INDUSTRIES, INC. (SIGN MANUFACTURING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
57
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Tallahatchie County, ranked by DC Readiness.

Sites near CHARLESTON INDUSTRIES, INC. (SIGN MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110759Substation-Adjacent230 kV300 MW2.8 yrs58.2
EC FFE Tallahatchie CountyGreenfield——1.4 yrs55.0
UNKNOWN110762Substation-Adjacent115 kV100 MW2.8 yrs54.3
WADE, INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing——3.5 yrs49.0
Tutwiler LandfillIndustrial——2.8 yrs48.4
Angelica ManufacturingIndustrial——2.8 yrs48.4
TALLAHATCHIE HARDWOOD, INC. (SAWMILLS)Manufacturing——3.5 yrs48.3
Glendora Cotton GinIndustrial——2.8 yrs48.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CHARLESTON INDUSTRIES, INC. (SIGN MANUFACTURING), Tallahatchie County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.