Skip to content
Gridcensus

UNKNOWN109369

Substation-Adjacent

SCOTT, Mississippi · MISO

DC Readiness
52.3
Fair / 100

UNKNOWN109369 is a substation-adjacent datacenter candidate site in SCOTT, Mississippi, interconnecting through MISO. It screens at 52.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN109369
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW

Speed to power

ISO / RTO regionMISO
Queue depth8
Avg queue wait2.8 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance69.0 mi
Fiber providers5
Fiber coverage32.1%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance44.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.21¢/kWh
Industrial electricity6.85¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,382

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
53
Fiber connectivity12%
22
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in SCOTT, ranked by DC Readiness.

Sites near UNKNOWN109369
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN142161Substation-Adjacent115 kV100 MW2.8 yrs52.4
UNKNOWN109387Substation-Adjacent115 kV100 MW2.8 yrs52.4
UNKNOWN109371Substation-Adjacent161 kV100 MW2.8 yrs52.3
UNKNOWN109524Substation-Adjacent161 kV100 MW2.8 yrs52.3
UNKNOWN109373Substation-Adjacent115 kV100 MW2.8 yrs51.6
UNKNOWN109525Substation-Adjacent115 kV100 MW2.8 yrs51.6
UNKNOWN109606Substation-Adjacent115 kV100 MW2.8 yrs51.6
TAP146073Substation-Adjacent115 kV100 MW2.8 yrs51.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN109369, SCOTT. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.