Skip to content
Gridcensus

GRIFFIN, INC. (HEAVY DUTY TRUCK MANUFACTURING)

Manufacturing

Marshall County, Mississippi

DC Readiness
52.9
Fair / 100

GRIFFIN, INC. (HEAVY DUTY TRUCK MANUFACTURING) is a manufacturing datacenter candidate site in Marshall County, Mississippi. It screens at 52.9/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPExpedient Memphis
IXP distance16.6 mi
Fiber providers9
Fiber coverage75.8%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterExpedient Memphis
DC distance16.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.87¢/kWh
Industrial electricity7.60¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,043

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track GRIFFIN, INC. (HEAVY DUTY TRUCK MANUFACTURING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
49
Fiber connectivity12%
82
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Marshall County, ranked by DC Readiness.

Sites near GRIFFIN, INC. (HEAVY DUTY TRUCK MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
TAP159899Substation-Adjacent161 kV100 MW2.8 yrs58.5
TAP159896Substation-Adjacent161 kV100 MW2.8 yrs58.5
TAP159900Substation-Adjacent161 kV100 MW2.8 yrs58.4
BYHALIASubstation-Adjacent161 kV100 MW2.8 yrs58.2
TAP154299Substation-Adjacent161 kV100 MW2.8 yrs58.1
TAP169482Substation-Adjacent161 kV100 MW2.8 yrs57.8
Greenfield (TAP400163 - CHICKASAW TRAILS I)Greenfield161 kV100 MW1.0 yrs57.8
COLDWATERSubstation-Adjacent161 kV100 MW2.8 yrs56.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for GRIFFIN, INC. (HEAVY DUTY TRUCK MANUFACTURING), Marshall County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.