Skip to content
Gridcensus

Lee County, Mississippi · MISO

DC Readiness
56.5
Good / 100

TAP149918 is a substation-adjacent datacenter candidate site in Lee County, Mississippi, interconnecting through MISO. It screens at 56.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP149918
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityTOMBIGBEE ELECTRIC POWER ASSNcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait2.8 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance68.0 mi
Fiber providers7
Fiber coverage96.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterC Spire Mississippi
DC distance68.0 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.49¢/kWh
Industrial electricity6.41¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$3,286

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP149918

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
49
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Lee County, ranked by DC Readiness.

Sites near TAP149918
SiteTypeVoltageCapacityQueue waitScore
OZ LeeGreenfield1.4 yrs60.5
OZ LeeGreenfield1.4 yrs58.4
OZ LeeGreenfield1.4 yrs57.9
TAP144803Substation-Adjacent161 kV100 MW2.8 yrs57.4
N. SHANNONSubstation-Adjacent161 kV100 MW2.8 yrs57.4
TUPELOSubstation-Adjacent161 kV100 MW2.8 yrs57.4
TAP149915Substation-Adjacent161 kV100 MW2.8 yrs57.3
TAP144802Substation-Adjacent161 kV100 MW2.8 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149918, Lee County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.