Skip to content
Gridcensus

UNKNOWN109653

Substation-Adjacent

Holmes County, Mississippi · MISO

DC Readiness
59.2
Good / 100

UNKNOWN109653 is a substation-adjacent datacenter candidate site in Holmes County, Mississippi, interconnecting through MISO. It screens at 59.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN109653
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait2.8 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance76.0 mi
Fiber providers3
Fiber coverage21.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance24.8 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity15.08¢/kWh
Industrial electricity9.46¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,992

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN109653

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
49
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Holmes County, ranked by DC Readiness.

Sites near UNKNOWN109653
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110073Substation-Adjacent115 kV100 MW2.8 yrs54.3
UNKNOWN110119Substation-Adjacent115 kV100 MW2.8 yrs53.6
TAP145957Substation-Adjacent115 kV100 MW2.8 yrs53.4
UNKNOWN109967Substation-Adjacent115 kV100 MW2.8 yrs53.2
BURROWS PAPER CORP. (PAPER (EXCEPT NEWSPRINT) MILLS)Manufacturing3.5 yrs49.7
G & C INDUSTRIES (NOT AVAILABLE)Manufacturing3.5 yrs48.9
BBS, LLC (OTHER MILLWORK (INCLUDING FLOORING ))Manufacturing3.5 yrs48.9
HUNTER ENGINEERING CO. (OTHER METALWORKING MACHINERY MANUFACTURING)Manufacturing3.5 yrs48.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN109653, Holmes County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.