Greene County, Mississippi · MISO

DC Readiness
51.5
Fair / 100

TAP143356 is a substation-adjacent datacenter candidate site in Greene County, Mississippi, interconnecting through MISO. It screens at 51.5/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP143356
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionMISO
Queue depth8
Avg queue wait2.8 yrs

Connectivity

Nearest IXPEdgeConneX New Orleans (EDCSLI01)
IXP distance94.6 mi
Fiber providers6
Fiber coverage87.7%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterEdgeConneX New Orleans (EDCSLI01)
DC distance94.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.81¢/kWh
Industrial electricity9.03¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,071

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
53
Fiber connectivity12%
45
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in Greene County, ranked by DC Readiness.

Sites near TAP143356
SiteTypeVoltageCapacityQueue waitScore
TAP169448Substation-Adjacent115 kV100 MW2.8 yrs53.5
UNKNOWN169447Substation-Adjacent115 kV100 MW2.8 yrs53.5
UNKNOWN109767Substation-Adjacent115 kV100 MW2.8 yrs53.5
LEAKESVILLE GOABSubstation-Adjacent69 kV50 MW2.8 yrs51.5
Mine SiteFormer Mine2.8 yrs51.1
AL-TOM FOREST PRODUCTS, INC. (SAWMILLS)Manufacturing3.5 yrs48.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP143356, Greene County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.