DC Readiness
50.4
Fair / 100

TRI-STATE POLE & PILING, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING) is a manufacturing datacenter candidate site in George County, Mississippi. It screens at 50.4/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityMISSISSIPPI POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPEdgeConneX New Orleans (EDCSLI01)
IXP distance82.6 mi
Fiber providers7
Fiber coverage95.0%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterEdgeConneX New Orleans (EDCSLI01)
DC distance82.6 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.78¢/kWh
Industrial electricity8.91¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,441

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TRI-STATE POLE & PILING, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in George County, ranked by DC Readiness.

Sites near TRI-STATE POLE & PILING, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING)
SiteTypeVoltageCapacityQueue waitScore
EC Near BenndaleGreenfield1.4 yrs60.1
TAP143376Substation-Adjacent115 kV100 MW1.0 yrs59.5
BENNDALE 230Substation-Adjacent230 kV300 MW2.8 yrs59.5
SOUTHEAST GREENESubstation-Adjacent230 kV300 MW2.8 yrs59.5
EC Near BenndaleGreenfield1.4 yrs57.8
EC Near BenndaleGreenfield1.4 yrs57.0
UNKNOWN110256Substation-Adjacent115 kV100 MW2.8 yrs55.7
UNKNOWN110311Substation-Adjacent115 kV100 MW2.8 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TRI-STATE POLE & PILING, INC. (CUT STOCK, RESAWING LUMBER, AND PLANING), George County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.