DeSoto County, Mississippi · MISO

DC Readiness
60.3
Good / 100

PLUM POINT is a substation-adjacent datacenter candidate site in DeSoto County, Mississippi, interconnecting through MISO. It screens at 60.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationPLUM POINT
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait2.8 yrs

Connectivity

Nearest IXPLevel(3) Memphis
IXP distance7.3 mi
Fiber providers6
Fiber coverage92.2%

Site characteristics

Land contactDeSoto County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterxAI Macrohardrr
DC distance5.2 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.81¢/kWh
Industrial electricity6.54¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,266

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track PLUM POINT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
49
Fiber connectivity12%
92
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in DeSoto County, ranked by DC Readiness.

Sites near PLUM POINT
SiteTypeVoltageCapacityQueue waitScore
FREEPORTSubstation-Adjacent500 kV1,000 MW1.0 yrs74.6
UNKNOWN115615Substation-Adjacent161 kV100 MW1.0 yrs67.3
SOUTHHAVENSubstation-Adjacent161 kV100 MW1.0 yrs66.6
HORN LAKESubstation-Adjacent230 kV300 MW2.8 yrs65.7
UNKNOWN110942Substation-Adjacent230 kV300 MW2.8 yrs65.7
UNKNOWN115611Substation-Adjacent161 kV100 MW1.0 yrs65.6
CHURCH ROADSubstation-Adjacent230 kV300 MW2.8 yrs64.6
GETWELLSubstation-Adjacent230 kV300 MW2.8 yrs64.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PLUM POINT, DeSoto County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.