Choctaw County, Mississippi · MISO

DC Readiness
62.6
Good / 100

WOLF CREEK is a substation-adjacent datacenter candidate site in Choctaw County, Mississippi, interconnecting through MISO. It screens at 62.6/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWOLF CREEK
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW
UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait2.8 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance38.5 mi
Fiber providers6
Fiber coverage97.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterC Spire Mississippi
DC distance38.5 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.65¢/kWh
Industrial electricity7.48¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,144

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track WOLF CREEK

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power20%
33
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Choctaw County, ranked by DC Readiness.

Sites near WOLF CREEK
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109619Substation-Adjacent500 kV1,000 MW2.8 yrs64.5
FRENCH CAMPSubstation-Adjacent500 kV1,000 MW2.8 yrs62.7
OZ ChoctawGreenfield——1.4 yrs59.0
STURGISSubstation-Adjacent161 kV100 MW2.8 yrs57.5
TAP144785Substation-Adjacent161 kV100 MW2.8 yrs56.9
TAP144783Substation-Adjacent161 kV100 MW2.8 yrs56.7
UNKNOWN109620Substation-Adjacent161 kV100 MW2.8 yrs56.5
UNKNOWN109635Substation-Adjacent161 kV100 MW2.8 yrs55.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for WOLF CREEK, Choctaw County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.