AMPCO Manufacturing Plant (former)

Industrial

BOLIVAR, Mississippi · MISO

DC Readiness
49.9
Fair / 100

AMPCO Manufacturing Plant (former) is an industrial datacenter candidate site in BOLIVAR, Mississippi, interconnecting through MISO. It screens at 49.9/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth8
Avg queue wait2.8 yrs

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance82.4 mi
Fiber providers8
Fiber coverage51.8%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score55/100

Location context

Nearest datacenterARE-ON Forrest City
DC distance82.4 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.22¢/kWh
Industrial electricity10.94¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,310

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
53
Fiber connectivity12%
64
Energy cost10%
50
Water risk8%
90
Natural hazard8%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in BOLIVAR, ranked by DC Readiness.

Sites near AMPCO Manufacturing Plant (former)
SiteTypeVoltageCapacityQueue waitScore
EC Near Delta (MS)Greenfield1.4 yrs57.6
EC Near Delta (MS)Greenfield1.4 yrs57.5
EC Near Delta (MS)Greenfield1.4 yrs57.3
EC FFE Bolivar CountyGreenfield1.4 yrs57.3
EC Near Delta (MS)Greenfield1.4 yrs56.7
EC Near Delta (MS)Greenfield1.4 yrs56.7
EC Near Delta (MS)Greenfield1.4 yrs56.1
EC Near Delta (MS)Greenfield1.4 yrs54.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AMPCO Manufacturing Plant (former), BOLIVAR. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.