Skip to content
Gridcensus

ABILITYWORKS OF KOSCIUSKO (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)

Manufacturing

Attala County, Mississippi

DC Readiness
49.3
Fair / 100

ABILITYWORKS OF KOSCIUSKO (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING) is a manufacturing datacenter candidate site in Attala County, Mississippi. It screens at 49.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

Avg queue wait3.5 yrs

Connectivity

Nearest IXPC Spire Mississippi
IXP distance55.1 mi
Fiber providers5
Fiber coverage31.5%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance42.3 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.23¢/kWh
Industrial electricity7.17¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$2,239

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track ABILITYWORKS OF KOSCIUSKO (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
51
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Attala County, ranked by DC Readiness.

Sites near ABILITYWORKS OF KOSCIUSKO (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
MCADAMSSubstation-Adjacent500 kV1,000 MW2.8 yrs63.5
KOSCIUSKOSubstation-Adjacent161 kV100 MW2.8 yrs55.4
UNKNOWN109651Substation-Adjacent115 kV100 MW2.8 yrs54.7
UNKNOWN109637Substation-Adjacent115 kV100 MW2.8 yrs54.6
UNKNOWN109636Substation-Adjacent115 kV100 MW2.8 yrs54.3
BLUFF SPRINGS PAPER CO. LTD. (DIE-CUT PAPER AND PAPERBOARD OFFICE SUPPLIES MANUFACTURING)Manufacturing——3.5 yrs49.4
COMPANION VANS, INC. (MOTOR HOME MANUFACTURING)Manufacturing——3.5 yrs49.3
MILWAUKEE ELECTRIC TOOL CORP. (HAND AND EDGE TOOL MANUFACTURING)Manufacturing——3.5 yrs49.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ABILITYWORKS OF KOSCIUSKO (PRINTED CIRCUIT ASSEMBLY (ELECTRONIC ASSEMBLY) MANUFACTURING), Attala County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.