Skip to content
Gridcensus

UNKNOWN131559

Substation-Adjacent

Sherburne, Minnesota · MISO

DC Readiness
55.5
Good / 100

UNKNOWN131559 is a substation-adjacent datacenter candidate site in Sherburne, Minnesota, interconnecting through MISO. It screens at 55.5/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN131559
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityCITY OF ELK RIVERmunicipal

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXPDataBank Minneapolis (MSP3)
IXP distance17.0 mi
Fiber providers10
Fiber coverage27.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDataBank
DC distance17.0 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.94¢/kWh
Industrial electricity9.05¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$7,181

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN131559

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
27
Fiber connectivity12%
69
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Sherburne, ranked by DC Readiness.

Sites near UNKNOWN131559
SiteTypeVoltageCapacityQueue waitScore
SHERBURNE COUNTYSubstation-Adjacent345 kV600 MW2.8 yrs66.9
ELK RIVERSubstation-Adjacent230 kV300 MW2.8 yrs64.8
MONTICELLOSubstation-Adjacent345 kV600 MW2.8 yrs62.9
EC Near Elk River City ofGreenfield——1.4 yrs60.5
EC Near Elk River City ofGreenfield——1.4 yrs60.0
EC Near Elk River City ofGreenfield——1.4 yrs59.9
EC Near Elk River City ofGreenfield——1.4 yrs59.9
EC Coal Sherburne CountyGreenfield——1.4 yrs59.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN131559, Sherburne is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.