UNKNOWN129597

Substation-Adjacent

Scott County, Minnesota · MISO

DC Readiness
60.4
Good / 100

UNKNOWN129597 is a substation-adjacent datacenter candidate site in Scott County, Minnesota, interconnecting through MISO. It screens at 60.4/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN129597
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilitySHAKOPEE PUBLIC UTILITIES COMMmunicipal

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXPCentersquare Minneapolis (MSP1)
IXP distance4.0 mi
Fiber providers18
Fiber coverage70.1%

Site characteristics

Land contactScott County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterCyrusOne Minneapolis
DC distance2.1 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.44¢/kWh
Industrial electricity11.76¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$9,547

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN129597

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
92
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Scott County, ranked by DC Readiness.

Sites near UNKNOWN129597
SiteTypeVoltageCapacityQueue waitScore
BLUE LAKESubstation-Adjacent345 kV600 MW2.8 yrs68.8
SCOTT COSubstation-Adjacent345 kV600 MW2.8 yrs68.5
HELENASubstation-Adjacent345 kV600 MW2.8 yrs67.1
CHUB LAKESubstation-Adjacent345 kV600 MW2.8 yrs66.4
UNKNOWN129620Substation-Adjacent115 kV100 MW2.8 yrs62.3
TAP138607Substation-Adjacent115 kV100 MW2.8 yrs62.3
UNKNOWN129604Substation-Adjacent115 kV100 MW2.8 yrs62.2
UNKNOWN132858Substation-Adjacent115 kV100 MW2.8 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.