Pine City Mill is a industrial datacenter candidate site in Pine County, Minnesota, interconnecting through MISO. It screens at 43.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth16

Connectivity

Nearest IXPVerus Corportation
IXP distance50.6 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterEncompass Minneapolis Facility
DC distance48.3 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.00¢/kWh
Industrial electricity8.42¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,269

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Pine County, ranked by DC Readiness.

Sites near Pine City Mill
SiteTypeVoltageCapacityQueue waitScore
Greenfield (FORBES - CHISAGO)Greenfield500 kV1,000 MW1.4 yrs70.5
Greenfield (FORBES - CHISAGO)Greenfield500 kV1,000 MW1.4 yrs70.4
Greenfield (FORBES - CHISAGO)Greenfield500 kV1,000 MW1.4 yrs70.4
Greenfield (FORBES - CHISAGO)Greenfield500 kV1,000 MW1.4 yrs70.0
UNKNOWN129347Substation-Adjacent230 kV300 MW1.4 yrs68.9
Greenfield (FORBES - CHISAGO)Greenfield500 kV1,000 MW1.4 yrs67.4
UNKNOWN129348Substation-Adjacent230 kV300 MW1.4 yrs66.7
Greenfield (FORBES - CHISAGO)Greenfield500 kV1,000 MW1.4 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen