UNKNOWN129369

Substation-Adjacent

Pierce County, Minnesota · MISO

DC Readiness
64.2
Good / 100

UNKNOWN129369 is a substation-adjacent datacenter candidate site in Pierce County, Minnesota, interconnecting through MISO. It screens at 64.2/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN129369
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionMISO
Queue depth10
Avg queue wait2.8 yrs

Connectivity

Nearest IXPDataBank Minneapolis (MSP2)
IXP distance29.1 mi
Fiber providers10
Fiber coverage65.3%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 1454573842
DC distance22.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.60¢/kWh
Industrial electricity8.60¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,863

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
51
Fiber connectivity12%
39
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Pierce County, ranked by DC Readiness.

Sites near UNKNOWN129369
SiteTypeVoltageCapacityQueue waitScore
OZ PierceGreenfield1.4 yrs59.8
Greenfield (UNKNOWN129369 - MAXWELL)Greenfield345 kV600 MW2.8 yrs58.9
UNKNOWN139706Substation-Adjacent115 kV100 MW2.8 yrs57.1
UNKNOWN131982Substation-Adjacent161 kV100 MW2.8 yrs56.6
UNKNOWN131981Substation-Adjacent161 kV100 MW2.8 yrs56.6
UNKNOWN171726Substation-Adjacent69 kV50 MW2.8 yrs55.8
TAP171725Substation-Adjacent69 kV50 MW2.8 yrs55.7
Prescott Eagle Ridge Business ParkShovel-Ready2.8 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.