UNKNOWN129753
Substation-AdjacentMcLeod, Minnesota · MISO
UNKNOWN129753 is a substation-adjacent datacenter candidate site in McLeod, Minnesota, interconnecting through MISO. It screens at 56.7/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in McLeod, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Glencoe | Greenfield | — | — | 1.4 yrs | 64.9 |
| EC Near Glencoe | Greenfield | — | — | 1.4 yrs | 64.2 |
| EC Near Hutchinson Plant #1 | Greenfield | — | — | 1.4 yrs | 63.0 |
| EC Near Glencoe | Greenfield | — | — | 1.4 yrs | 62.9 |
| EC Near Glencoe | Greenfield | — | — | 1.4 yrs | 62.8 |
| Hutchinson Landfill | Brownfield | 69 kV | 0 MW | 2.8 yrs | 61.9 |
| EC Near Glencoe | Greenfield | — | — | 1.4 yrs | 61.8 |
| EC Near Hutchinson Plant #1 | Greenfield | — | — | 1.4 yrs | 61.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN129753, McLeod. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.