Marshall County, Minnesota · MISO

DC Readiness
59.7
Good / 100

TAP133980 is a substation-adjacent datacenter candidate site in Marshall County, Minnesota, interconnecting through MISO. It screens at 59.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP133980
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityP K M ELECTRIC COOP, INCnot available

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXP232 20th St NW, East Grand Forks
IXP distance20.5 mi
Fiber providers4
Fiber coverage91.9%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenter232 20th St NW, East Grand Forks
DC distance20.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.31¢/kWh
Industrial electricity5.40¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,168

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 6 nearby

Get alerts

Track TAP133980

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
45
Fiber connectivity12%
83
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Marshall County, ranked by DC Readiness.

Sites near TAP133980
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN130129Substation-Adjacent115 kV100 MW2.8 yrs57.9
UNKNOWN130136Substation-Adjacent115 kV100 MW2.8 yrs57.9
Former Warren Power PlantIndustrial——2.8 yrs53.8
Mine SiteFormer Mine——2.8 yrs51.9
Mine SiteFormer Mine——2.8 yrs51.9
Mine SiteFormer Mine——2.8 yrs51.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.