Spring Grove Industrial Park

Shovel-Ready

Houston County, Minnesota · MISO

DC Readiness
49.2
Fair / 100

Spring Grove Industrial Park is a shovel-ready datacenter candidate site in Houston County, Minnesota, interconnecting through MISO. It screens at 49.2/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityMIENERGY COOPERATIVEcooperativemoderate to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXPSFN MN-Rochester
IXP distance51.5 mi
Fiber providers6
Fiber coverage64.7%

Site characteristics

Site typeShovel-Ready
Acreage6 ac
Buildable load (est.)~2–6 MWland-based
Land contactHouston County County Assessor
Former useZoning: Industrial & Commercial; Co-op: MiEnergy

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterNP Rochester
DC distance51.5 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.35¢/kWh
Industrial electricity8.38¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$5,209

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Spring Grove Industrial Park

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
55
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
32
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Houston County, ranked by DC Readiness.

Sites near Spring Grove Industrial Park
SiteTypeVoltageCapacityQueue waitScore
GENOASubstation-Adjacent161 kV100 MW2.8 yrs60.1
EC Coal Houston CountyGreenfield——1.4 yrs59.1
EC Coal Houston CountyGreenfield——1.4 yrs58.8
UNKNOWN144321Substation-Adjacent69 kV50 MW2.8 yrs54.7
TAP158799Substation-Adjacent69 kV50 MW2.8 yrs54.5
UNKNOWN144324Substation-Adjacent69 kV50 MW2.8 yrs54.3
TAP158800Substation-Adjacent69 kV50 MW2.8 yrs54.2
TAP158805Substation-Adjacent69 kV50 MW2.8 yrs54.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.