Deuel County, Minnesota · MISO

DC Readiness
54.7
Fair / 100

TAP138569 is a substation-adjacent datacenter candidate site in Deuel County, Minnesota, interconnecting through MISO. It screens at 54.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP138569
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityOTTER TAIL POWER COinvestor owned

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXPTierPoint Sioux Falls - East
IXP distance81.0 mi
Fiber providers3
Fiber coverage99.6%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterTierPoint Sioux Falls - East
DC distance81.0 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (no_income_tax)
Commercial electricity10.10¢/kWh
Industrial electricity8.70¢/kWh
Cooling degree days700
Heating degree days7,300
Land price / acre$5,470

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: No state corporate income tax; no personal income tax; no personal property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP138569

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
45
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
76
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Deuel County, ranked by DC Readiness.

Sites near TAP138569
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN131150Substation-Adjacent230 kV300 MW3.3 yrs62.1
UNKNOWN131157Substation-Adjacent115 kV100 MW3.3 yrs57.3
TAP167730Substation-Adjacent69 kV50 MW3.3 yrs55.8
TAP167807Substation-Adjacent69 kV50 MW3.3 yrs55.7
UNKNOWN167809Substation-Adjacent69 kV50 MW3.3 yrs55.7
TAP167805Substation-Adjacent69 kV50 MW3.3 yrs55.4
TAP167806Substation-Adjacent69 kV50 MW3.3 yrs55.1
UNKNOWN144213Substation-Adjacent69 kV50 MW3.3 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138569, Deuel County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.