Skip to content
Gridcensus

UNKNOWN129676

Substation-Adjacent

Crow Wing County, Minnesota · MISO

DC Readiness
55.7
Good / 100

UNKNOWN129676 is a substation-adjacent datacenter candidate site in Crow Wing County, Minnesota, interconnecting through MISO. It screens at 55.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN129676
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityMILLE LACS ENERGY COOPERATIVEcooperativemoderate to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth127
Avg queue wait2.8 yrs

Connectivity

Nearest IXPDataBank Minneapolis (MSP3)
IXP distance85.6 mi
Fiber providers9
Fiber coverage69.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterDataBank
DC distance85.7 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.65¢/kWh
Industrial electricity9.94¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,187

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; large-load tariffs emerging.

DC tax incentiveYes
Large-load threshold≥ 50 MW

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN129676

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
45
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
92
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Crow Wing County, ranked by DC Readiness.

Sites near UNKNOWN129676
SiteTypeVoltageCapacityQueue waitScore
RIVERTON 230/115 KVSubstation-Adjacent230 kV300 MW2.8 yrs60.6
TAP136156Substation-Adjacent230 kV300 MW2.8 yrs60.5
EC Coal Crow Wing CountyGreenfield——1.4 yrs59.7
EC Coal Crow Wing CountyGreenfield——1.4 yrs57.3
EC Coal Crow Wing CountyGreenfield——1.4 yrs56.8
EC Coal Crow Wing CountyGreenfield——1.4 yrs56.5
BRAINERDSubstation-Adjacent115 kV100 MW2.8 yrs56.4
UNKNOWN129731Substation-Adjacent115 kV100 MW2.8 yrs56.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN129676, Crow Wing County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.